- Text Only
City of Huntsville, AL
  
 Mayor Tommy Battle  |Employment  |Departments  |I Want To...  |City Government  |For Residents  |For Visitors  |Election Information

Engineering Department

        Recent Press Releases

Pratt Ave temporary closure-Hundley Dr to Washington St [MORE INFO]


Pelham Ave at Davis Cir-temporary closure [MORE INFO]


Pegram St between Church St and Pratt Ave closure [MORE INFO]


Lowe Ave closure between Gallatin and Williams [MORE INFO]

Archived Construction Plans

Plans are Adobe .pdf format.


A
Airport Rd./Memorial Parkway Intersection Improvements (2 mB)


Aldridge Creek WWTP Improvements (15 mB)


Aldridge Creek Greenway, Phase IV - Revised Drawings per Addendum No. 1

Aldridge Creek Greenway, Phase IV - DRAWINGS (31MB .pdf file)

Asbestos Abatement at former Holiday Inn Site, Project No. 65-15-SP01
  • Quantities

  • Advertisement

  • Holiday Inn (401 Williams Avenue, Huntsville, AL 35801) Asbestos Removal Survey Results


  • Avocent Sidewalk (2.2 mB)


    B
    Balch Road Improvements (144 mB)

    Balch Road Signal Sheets A1 and A2 (208 KB)


    Beadle Ln Pump Station (7.4 mB)


    Beadle Lane Drainage Improvements | Drawings

    Beadle Ln Sanitary Sewer (5.5 mB)


    Big Cove Road Drainage Improvements (49.7 mB)

    Big Cove WWTP Improvements (61.2 mB)

    Big Spring Park East-Colored Lighting Installation, Project No. 65-14-SP18
    Drawings

    Boardman St. improvements (3.0 mB)


    Bob Heath Dr. Paving (20.5 mB)


    Bob Wallace Widening and Merchants Walk Improvements, Project No. 65-14-DR04 - Drawings


    Brandontown Rd. improvements (6.0 mB)

    Burgreen Road Sanitary Sewer Extension, Project No. 65-11-SS05 - Drawings

    C
    Capshaw Sanitary Sewer Extension (9.4 mB)


    Cecil Ashburn Turn Lane, Project No. 65-14-TI01

    Cedarhurst Drainage Improvements (8.1 mB)

    Chase Farm Industrial Access Road Improvements, Project No. 71-16-RD01 & COH Project No. IAR-042-000-009 - Drawings - Drawings Per Addendum No. 3

    Christopher Drive Sanitary Sewer (16.2 mB)


    Christopher Drive Left Turn Lane from U. S. Highway 72, Project No. 65-12-TI03 - Drawings


    Churchill Sanitary Sewer (7 mB)

    Clinton Ave Bridge over Broglan Branch (12.4 mB)

    Clinton Avenue Bridge over Pinhook Creek (10 mB)

    Clinton Avenue Performing Arts Project, Project No. 65-15-SP33 - Drawings Per Addendum No. 3 - Drawings

    Clinton Avenue Ramp Improvements (1.79 mB)


    Clinton Avenue Streetscape Basement Repairs (11.4 mB)

    Clinton Avenue Streetscape Phase 2 (15.2 mB)

    Clinton Avenue Streetscape Phase 3 (794 kB)

    Cured In-Place Pipe Installation Aldridge Creek Basin (3.2 mB)

    Courthouse Square Improvements (20.9 mB)

    D
    Dill Street Drainage Improvements (No Bidders-not constructed; 14.4 mB)


    Dry Creek Greenway (20 mB)

    Downtown Gateway (Harvard Road Extension), Project No. 65-11-RD03. Drawings Per Addendum No. 3
    Drawings

    Downtown Gateway (Harvard Road Extension)-REBID, Project No. 65-11-RD03.

  • Drawings

  • Downtown Huntsville Wayfinding Sign System Master Plan

  • Drawings

  • Dug Hill Rd at US 431 Improvements-REBID (4.5 mB) and Dug Hill Replacement Sheets

    Dug Hill Intersection Improvements


    E
    Eagle Dr. (16 mB)


    Emerald Ridge Subdivision (29.5 mB)


    Emerald Ridge Subdivision Electrical Lay-out (1.93 mB)


    Explorer Blv/Farrow Rd (15.6 mB)


    Explorer Blv/Pegasus Dr (11.8 mB)


    Explorer Blv/Pegasus Dr Ditch Culvert (5.8 mB)


    Explorer Blv-Farrow Rd Irrigation Plans (2.1 mB)


    Explorer Blv-Farrow Rd Landscape Requirements (1.3 mB)

    Explorer Blv Completion (15.3 mB)

    Explorer Blv Completion Correction Page 1 of 2 C1.1 (671 KB)

    Explorer Blv Completion Correction Page 2 of 2 C1.1 (311 KB)

    Explorer Blv Completion Revised Landscape Sheets (938 KB)

    Explorer Blv Completion Revised Irrigation Sheets (15.3 mB)

    Explorer Blv Completion LCE with treeline (1.11 mB)

    Explorer Blv Completion Aid to Construction (1.27 mB)

    Explorer Blv Mass Grading (7.3 mB)

    Explorer Blv Mass Grading Correction Page C2.3 (796 KB)

    Explorer Blv Mass Grading Correction Page C2.4 (743 KB)

    F
    Five Points Improvements (12.2 mB)


    Flint River Greenway (16.5 mB)

    Flint River Greenway, Phase II (13.6 mB)

    Freedom Park, Project No. 65-15-SP20 - Bid Results and Revised Drawings

    Freedom Park-Rebid, Project No. 65-15-SP20

    Drawings

    G
    Gateway Forcemain, Drawings

    Gateway Greenway, Phase II, Project No. 65-13-WP01
  • Drawings


  • Gateway Park (6.4 mB)


    Goldsmith-Schiffman Wildlife Sanctuary Construction Package, Project No. 65-15-SP02
  • OMI Plans

  • LDS Plans


  • Goose Creek Sewer Pump Station, Project No. 65-07-SM01.
  • Drawings

  • Governors Drive Phase 1 (Available at G.W. Jones) Re-issued sheets Due to file size, contact G.W. Jones for a set of complete plans or individual sheets; 533-3311 (336 kB)

    Governors Drive Phase II
    Final Plan Set (117 mB)

    Governors Drive Railroad Crossing (7.8 mB)


    Governors West Roadway Improvements, Project No. 65-12-RD12
  • Drawings


  • Granada Dr. Culvert Replacement (16.1 mB)


    Greenbrier Parkway, Phase II-A Combing Phase II with TIF Portion of Phase III-B, Project No. 71-16-RD02
    Drawings-South of Old Highway 20 (Garver)

    Drawings-North of Old Highway 20 (Littlejohn)

    Greenbrier Parkway, Phase III-B, Project No. 65-13-RD02 Drawings

    Greenbrier Parkway, Phase III-A, Project No. 65-13-RD02 & ALDOT Project No. IAR-042-000-008 Final Construction Plans

    H
    Harris Hills Road Improvements (37.2 mB)


    Heart of Huntsville Bridge at Pinhook Creek (21.7 mB)


    Heart of Huntsville Roadway Improvements (13.1 mB)


    Highway 72 West median crossing at MP 89.65 (5.6 mB)


    Highway 72-West and Watercress Boulevard Turn Lane Improvements, Project No. 65-14-SP40 - Drawings

    U.S. Highway 72-West & Promenade Parkway Improvements
    Revised Drawings per Addendum No. 1
    Drawings-Promenade Parkway
    Drawings-US 72-West

    Hobbs Island Road Bridge (3.4 mB)


    Holmes and Lincoln Intersection Improvements (9.1 mB)


    Holmes Avenue and Washington Street Streetscape Improvements

    Drawings Per Addendum No. 2
    Drawings (47MB .pdf file)

    Winchester Road & Homer Nance Road Intersection Improvements, Project No. 65-15-TI01. - Bid Results and Drawings

    Highway 431 Turn Lane Improvements, Project No. 65-14-TI02
  • Drawings


  • I
    Indian Creek Greenway, Phase IV


    Industrial Access and Turn Lanes to the Toyota Plant, Project No. 65-13-SP24 and ALDOT Project No. IAR-045-000-009.
    Revised Drawings per Addendum No. 1
    Drawing

    J
    JIPN Access Road Airport Authority, Phase I (9.6 mB)


    Jetplex Tradeport Grading Plans (13.0 mB)


    Jeff Road Widening
    Drawings - Revised Sheets
    Drawings - Complete Set (15 MB)

    Jefferson Street Streetscape Improvements, Phase I, Project No. 65-15-SP04 - Drawings - Drawings Per Addendum No.1

    Jones Farm Park Greenway (7.84 MB)


    K
    Knox Creek East Phase 3B Sewer (7.3 mB)


    Knox Creek East Phase 3D Sewer (6.3 mB)


    Knox Creek Sanitary Sewer Extension (8.2 mB)


    L
    Lake Forest Pump Station. (13.5 mB)


    Lawson Ridge Intersection Improvements (2.8 mB)


    Little Cove Rd. Sanitary Sewer (20.1 mB)


    Little Cove Roadway and Greenway Improvements (41 mB)


    HU Water Relocates Little Cove Roadway and Greenway Improvements (1.03 mB)


    M
    Magnolia Springs Sewer (12.5 mB)


    Maple Hill Cemetery Drainage Improvements (6.1 mB)


    Maple Hill Cemetery Addition, Project No. 65-14-SP01
  • Drawings


  • Martin Road Improvements on Redstone Arsenal 100% Roadway Plans | Drawings (Electrical Relocation Phase), Project No. 65-10-RD09

    Martin Road on Redstone Arsenal, Project No. 65-10-RD09
    Revised Drawings per Addendum No. 1
    Drawings

    Mathis Mtn. Improvements (1.4 mB)


    Meridian Street Phase II (Pratt to Oakwood) ALDOT Construction Plans (107 pgs) (443 mB)


    Monte Sano Street Resurfacing. (3.8 mB)


    Moores Mill Rd at Harris Hill Farm (37.2 mB)


    N
    Nance Road Widening Improvements (26.2 mB)

    Nance Road Widening Improvements (Revised Sheet #10)

    Nance Road Widening Improvements (Revised Sheet #14)


    Nolen Avenue Drainage Improvements (2.57 mB)


    North Huntsville Industrial Park Walking Trail and Parking Lot (3.2 mB)


    North Huntsville Industrial Park Sanitary Sewer Extension to Lot 20 (2.4 mB)


    North Huntsville Industrial Park Sanitary Sewer Extension to Henderson Property (1.6 mB)


    North-South Connector Road, Project No. 65-11-RD01 - Drawings

    O
    OEA Studies

    Old Big Cove Road King Drake Ph I Improvements (22.1 mB)

    Old Big Cove Road King Drake Ph I Improvements Revised Sheet 2 (735 KB)


    Oakwood Road Widening and Relocation of Old Monrovia Rd (22.5 mB)


    Oakwood Road Widening and Relocation of Old Monrovia Rd revised plan sheets (5.3 mB)


    Oakwood College Bike Lanes (7.9 mB)


    Old Madison Pike Bridge Rail (1.7 mB)


    Old Madison Pike-Slaughter Road (2.9 mB)


    Old Monrovia Bridge Plans (27.5 mB)


    P
    Periodic Bid for Emergency Pipe Bursting-2015, Project No. 65-15-SP44 - Bid Results

    Periodic Bid for Traffic Striping and Marking-2015, Project No. 65-15-SP48 - Bid Results

    Pipe Bursting for Spring Branch and Aldridge Creek Basin (1.9 mB)


    Pulaski Pike Sanitary Sewer and Forcemain (5.20 mB)


    Pulaski Pike Sanitary Sewer M-1 Detail (231 KB)


    Pueblo Sidewalk Plans (3.3 mB)


    Q

    R
    Redstone Gateway Pump Station Drawings (1.4 mB)

    Redstone Gateway Package 1D - Drawings

    Redstone Gateway Package 1D - Revised Drawings per Addendum No. 1

    Redstone Gateway Package 1D - Revised Drawings per Addendum #6

    Redstone Gateway Package 1D - Revised Drawings per Addendum #4

    Redstone Gateway Package 1A -
    Rev 1 Relocate Fence @ gate Part I | Part II | Part III | Part IV
    Rev 2 Grading CG Perm and Temp Culvert Adjustments - 2A | 2B | 2C
    Rev 3 Addition of gravity sewer to Plateau - Revision 3
    Rev 4 Pond Entrance Adj - Revision 4
    Rev 5 Culvert Adj. @ Entrance - Revision 5
    Rev 6 Ditch south of Visitor Center - Revision 6
    Rev 7 Note and details for storm culverts - Revision 7A | 7B | 7C
    Rev 8 Culvert Access Details - Revision 8
    Rev 9 Manhole Rim Adj for Plateau - Revision 9
    Rev 10 regradnig and extending retail road - Revision 10
    Rev 11 grading adjustments - Revision 11
    Rev 12 Intersection Signal - Revision 12A | 12B
    Rev 13 Pond Doutlet - Revision 13
    Rev 14 Sleeve deduction - Revision 14
    Rev 15 Storm structures adja long KDT - Revision 15A | 15B
    Rev 16 Outlet structureat 1D pond RR pond - Revision 16
    Rev 17 Revision Revision 17

    Redstone Gateway, Phase 1A - Geotech Report

    Redstone Gateway, Phase 1A - Environmental Assessment Report

    Redstone Gateway, Phase 1A - Addendum #6 Updated as of 3:20pm on 12/7/2010

    Redstone Gateway, Phase 1A - Addendum #5

    Redstone Gateway, Phase 1A - Addendum #4 (24MB)

    Redstone Gateway, Phase 1A - Addendum #4 - Part I | Part II | Part III | Part IV    UPDATED DRAWINGS ONLY

    Redstone Gateway, Phase 1A - Addendum #3

    Redstone Gateway, Phase 1A - Addendum #2

    Redstone Gateway, Phase 1A - Addendum #1

    Redstone Gateway, Phase 1A - Advertisement

    Redstone Gateway, Phase 1A - Specifications

    Redstone Gateway, Phase 1A - Plans: Table of Contents | Redstone Gateway, Phase 1A - Part1 | Redstone Gateway, Phase 1A - Part2 | Redstone Gateway, Phase 1A - Part3 | Redstone Gateway, Phase 1A - Part4 (The Plans file is separated into 5 parts for easy download)

    Redstone Gateway Package 1B-Roadways and Utilities -
    Addenda No. 2 - Revised Plans - C8.1 through C8.3
    Addendum No. 1 - Revised Plans - Water System - C9.0 & C9.1
    Addendum No. 2
    Addendum No. 1
    Plans Table of Contents - Part I - Part II - Part III - Part IV

    Redstone Gateway Package 1B-1 1B-2 and 1B-3 -
    Revision 1 1A | 1B | 1C | 1D
    Revision 2
    Revision 3

    Redstone Gateway Package 1B-5 Gravity Sanitary Sewer
    Rev 1 - stone backfill from 18A to 6C,21A - Revision 1A | 1B
    Rev 2 - Flex line and Stubs - Revision 2A | 2B
    Quantities - Attachment A
    Addendum No. 2
    Addendum No. 1
    Pre-Bid Attendess
    Specifications
    Plans Table of Contents - Part I - Part II - Part III
    Phase 1B-5 Geotechnical Report 3-18-11
    Final Geotechnical Report
    Phase 1B-5 Geotechnical Report 11-19-10

    Redstone Gateway Package 1D - Rail Spur Relocation / Installation
    Revised Drawings per Addendum #6
    Revised Drawings per Addendum #4
    Revised Drawings per Addendum No. 1
    Drawings

    Redstone Gateway-Package 1E Rideout Road Interim Improvements, Project No. 65-11-SP08
    ALDOT Special Drawing HW-614-SP per Addendum No. 3
    Revised Drawings per Addendum No. 2
    Drawings (due to the size of the drawings the files are broken into various sections):
    C4.0-C5.5 - C6.0-C9.4 - C10.0-C11.8 - C12.0-C12.3 - T1.0-C3.3

    Redstone Gateway Package 1G-Landscape, Irrigation, and Hardscape
    Revision 1 (not yet available)
    Revision 2A | 2B
    Revision 3
    Revision 4
    Addendum No. 3 - DRAWINGS
    Addendum #1 Drawings
    Drawings - Hardscape
    Drawings - Irrigation
    Drawings - Planting

    Redstone Gateway Package I-Lake F (Bid Package I-1 Mass Grading, Fine Grading, Erosion Control, Storm, and Pond Liner), Project No. 65-12-SP23

    Bid Results-Apparent low bidder, Reed Contracting Services, Inc., pending City Council approval on February 28, 2013.
  • Addendum No. 5

  • Addendum No. 5 Drawing

  • Geotechnical Report 2-8-13

  • Drawings Per Addendum No. 4

  • Addendum No. 4

  • Addendum No. 3

  • Addendum No. 2

  • Addendum No. 1

  • Pre-Bid Meeting Attendees

  • Redstone Arsenal Electrical Substation-Foundations

  • Final Geotechnical Report - Package F dated 8/5/11

  • Environmental Assessment Report

  • Package 1A Boring Plan revised 12/2/10

  • Five acre pond liner recommendations dated 3/12/12

  • Final Geotechnical Report Package 1A 9/22/12

  • Redstone Arsenal Electrical Substation

  • Drawings

  • Specifications

  • Advertisement


  • Redstone Gateway-Package I-Lake F, Project No. 65-12-SP23

    Bid Results

  • Addendum No. 6

  • Drawings per Addendum No. 5

  • Addendum No. 5

  • Addendum No. 4

  • Drawings Per Addendum No. 3

  • Addendum No. 3

  • Addendum No. 2

  • Drawings per Addendum No. 1

  • Addendum No. 1

  • Redstone Arsenal Electrical Substation-Foundations

  • Final Geotechnical Report - Package F dated 8/5/11

  • Environmental Assessment Report

  • Package 1A Boring Plan revised 12/2/10

  • Five acre pond liner recommendations dated 3/12/12

  • Final Geotechnical Report Package 1A 9/22/12

  • Redstone Arsenal Electrical Substation

  • Pre-Bid Meeting Attendees

  • Drawings (52MB)

  • Specifications

  • Advertisement


  • Redstone Gateway Package I-Lake F (Bid Packages I-3 Substation and Electrical Distribution Demolition and I-4 Concrete Box Culvert), Project No. 65-12-SP23

  • Drawings Per Addendum No. 2

  • Revised Bid Form

  • Addendum 3

  • Addendum 2

  • Addendum 1

  • Pre-Bid Meeting Attendees

  • Specifications

  • Redstone Arsenal Electrical Substation-Foundations

  • Final Geotechnical Report - Package F dated 8/5/11

  • Environmental Assessment Report

  • Package 1A Boring Plan revised 12/2/10

  • Five acre pond liner recommendations dated 3/12/12

  • Final Geotechnical Report Package 1A 9/22/12

  • Redstone Arsenal Electrical Substation

  • Advertisement

  • Drawings


  • Redstone Gateway Package 1F-Redstone Gateway Extension, Market Street, and Overlook Road Relocation, Project No. 65-11-SP22
    Drawings per Addendum No. 2
  • Addendum No. 4

  • Addendum No. 3

  • Addendum No. 2
    Revised Drawings per Addendum No. 1(due to the size of the drawings the files are broken into various sections):
    C11.6 - C14.4-C14.9 - T1.0-C11.3 Part1 - T1.0-C11.3 Part2 - T1.0-C11.3 Part3
    Addendum No. 1 Drawings (due to the size of the drawings the files are broken into various sections):
    C3.4-C5.1 - C5.2-C7.4 - C7.5-C9.4 - C9.5-C10.5 - C11.0-C13.2 - C13.3-C13.14
    C14.0-E1.0 - LH-1-LI-4 - LI-5-LP-6 - T1.0-C3.3

    Drawings-Table of Contents

    Redstone Gateway Extension, Market Street, and Overlook Road Relocation Package 1F-4 Landscaping & Irrigation, Project No. 65-11-SP22

    Bid Results-Apparent low bidder, Vision Landscapes-Pending City Council Approval on May 24, 2012.

  • Addendum No. 5

  • Addendum No. 4

  • Addendum No. 3

  • Addendum No. 2

  • Addendum No. 1

  • Environmental Assessment Report

  • Geotechnical Report

  • All Drawing files (143MB)

  • Individual Drawings parts
    Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9

  • Specifications

  • Advertisement



  • Redstone Gateway Extension, Market Street, and Overlook Road Relocation Package 1F-2 Water Systems and Package 1F-3 Primary Communication and Primary Electrical, Project No. 65-11-SP22

    Bid Results - Package 1F-2 Bid Results-Apparent low bidder, Christopher Professional Enterprises, Inc., pending City Council approval on 4/26/12
    Bid Results - Package 1F-3 Bid Results-Apparent low bidder, Christopher Professional Enterprises, Inc., pending City Council approval on 4/26/12

  • Drawings per Addendum No. 2

  • Addendum No. 2

  • Addendum No. 1

  • Pre-bid Meeting Attendees

  • Environmental Assessment Report

  • Geotechnical Report

  • Specifications

  • All Drawing files (143MB)

  • Individual Drawings parts
    Part 1 | Part 2 | Part 3 | Part 4 | Part 5 | Part 6 | Part 7 | Part 8 | Part 9

  • Advertisement



  • Redstone Gateway Package H Monumental Architectural Signage, Project No. 65-12-SP22
    Bid Results- Apparent low bidder, Knight Signs-Pending City Council Approval on May 24, 2012.

  • Addendum No. 3


  • Addendum No. 2


  • Drawing per Addendum No. 1


  • Addendum No. 1


  • Drawings (16MB)


  • Specifications


  • Advertisement




  • Redstone Gateway Package J-Temporary Visitor Center Relocation, Project No. 65-13-SP23
  • Addendum No. 4

  • Addendum No. 3

  • Revised Drawings per Addendum No.3

  • Revised Bid Form

  • Addendum No. 2

  • Pre-Bid Meeting Attendees

  • Specifications

  • Technical Criteria

  • Drawings

  • Geotech Report

  • Addendum No. 1

  • Advertisment




  • Research Park Lake 4Drawings



    Research Park Stormwater Improvements, Project No. 65-13-DR01
    Revised Drawings Per Addendum No. 2
    Drawings

    Resurfacing of Residential Streets Phase 2 (1.3 mB)


    Resurfacing of Residential Streets Phase 4 (2.0 mB)


    Resurfacing of Residential Streets Phase 5 (1.3 mB)


    Resurfacing of Residential Streets Phase 6 (684 kB)


    Resurfacing of Residential Streets 2007 Phase 1 (5.5 mB)


    Resurfacing of Residential Streets 2007 Phase 2 (5.4 mB)


    Resurfacing of Residential Streets 2008 Phase 3 (8.9 mB)


    Resurfacing of Residential Streets 2009 Phase 1 (4.95 mB)


    Resurfacing of Residential Streets 2010 Phase 1 (21.4 mB)


    Rodgers Drive Drainage Improvements, Project No. 65-13-DM17 - Drawings

    Rosalie Ridge Drive Drainage Improvements, Project No. 65-11-DM45 - Drawings

    S
    Sanitary Sewer Rehab Pipe Replacment (6.10 mB)


    Sanitary Sewer Rehabilitation Cured-in-Place Pipe (CIPP) Installation-2013, Project No. 65-13-SP32 - Drawings

    Sanitary Sewer Relocation Project-Widening and Relocation of church Street, Phase I, Project No. 65-01-RD05 & ALDOT Project No. STPHV-4500(200)- Drawings per Addendum No. 2 - Drawings

    Sparkman Drive Turn Lane, Project No. 65-15-TI02 - Drawings

    South Memorial Parkway Access Improvements, Project No. 65-13-TI02 Drawings

    South Side Square Improvements (5.6 mB)


    Spring Branch Wastewater Treatment Plant Improvements (4.7 mB)


    Spring Branch Wastewater Treatment Plant Improvements,Project No. CS-010307-14

    Drawings Part I(342 MB file) | Drawings Part II(224 MB file)
    Stanford Drive/Auburn Drainage Improvements (23.5 mB)


    Squaw Valley Interceptor (28.6 mB)


    T
    Taylor Lane Widening (52.7 mB)


    Taylor Road Extension Phase II (91.1 mB)


    Taylor Rd. Extension Culvert (1.81 mB)


    Taylor Rd. Extension Culvert Wing Wall Detail (1.38 KB)


    Taylor Rd. Ditch from Creekstone to Liberty Park (1.9 mB)


    Taylor Rd. at Little Mountain Ditch (1.6 mB)


    Taylor Rd. Sanitary Sewer (5.3 mB)


    Thompson Tractor Decel Lanes (3.48 mB)


    Thornton Avenue Drainage Improvements, Phase III, Drawings

    Twelvestones Subdivision Street Repairs (2 mB)


    U
    UAB Landscape Plans (1.8 mB)


    UAB Landscape Plans (1.8 mB)


    Unnamed Road (aka Mark Smith Blvd - 17.3MB)


    U. S. Highway 72 Improvements east of Nance Road, Drawings

    V
    Valleybrook Pump Station Plans (4.5 mB)


    Veterans Drive Extension, Drawings


    W
    Wade Rd. Sanitary Sewer (5 mB)


    Wall Triana Culvert Extensions (16 mB)

    REVISED PLAN SHEETS per Addenda #1 Wall Triana Culvert Extensions (9.14 mB)


    Weatherly Road Extension (aka Haysland Road), Project No. 65-14-RD01.

  • Huntsville Utilities-Water

  • Huntsville Utilities-Power

  • Huntsville Utilities-Lighting

  • Option No. 2 Drawings

  • Drawings


  • Western Area Gravity Sewer Phase I (27.9 mB) and Western Area Gravity Sewer Phase I revised sheets C1-C15 (21.2 mB)


    Western Area Interceptor Phase II (24.4 mB)


    Western Area Interceptor Phase II Revised Plans Sheets (7.09 mB)


    Western Area Interceptor Phase II Concrete Driveway Detail (7.61 mB)


    Western Area Interceptor Phase III (11.7 mB)


    Western Area Interceptor Phase IV-Contract A (9.14 mB)


    Western Area Interceptor Phase IV-Contract B (9.14 mB)


    Western Area Interceptor Phase V - DRAWINGS

    Westmoreland Ave./Lytle Dr. Drainage Improvements (9.0 mB)


    Winchester Road & Homer Nance Road Intersection Improvements, Project No. 65-15-TI01. - Bid Results and Drawings

    WPC Sanitary Sewer Relocation-County Line Road & I-565, Project No. 65-12-SM01 - Drawings

    Wynn Drive Relocation, Project No. 65-15-RD02 - Drawings

    X
    Y
    Z

    DISCLAIMER: These drawings represent designs prepared for use by the City of Huntsville, Alabama and are not to be copied, reproduced, altered, or used by anyone, or any organization, without the expressed written consent of the City of Huntsville Engineering Division representative authorized to approve their use. Anyone making unauthorized use of these drawings may be prosecuted to the fullest extent of the law.




    BigPictureHuntsville.com Imagine Huntsville? Mayor Tommy Battle
    City Of Huntsville Huntsville eGOV
    Huntsville Connect: Submit Service Requests
    Huntsville's Online - Forms/Applications
    Alabama's Paperless Filing - Pay Taxes
    Inspection Requests - Details
    Municipal Court - Pay tickets online
    Huntsville Police Records - Search
    Portable Storage (PSS) - Permits
    Search City Laws - Online Database
    Electronic Plans - Review Submittal

    Hunstville Facebook HunstvilleCity Twitter Huntsville YouTube Huntsville Instagram
    HSV1 - City of Huntsville ADA Compliance
    only search HuntsvilleAL.gov
    Service Requests
    HSV Connect    Healthy Huntsville

    ADA :: Publications/Documents :: City Council Agendas/Documents :: HSV1 / Video on Demand :: About the Logo :: Moving to Huntsville?
    © Copyright All Rights Reserved | City of Huntsville, Alabama | Privacy Policy | Site Map | COH E-mail | COH ESS | COH Intranet