New Signal Installation: Jan Davis Drive at BAE/Raytheon
Published on May 14, 2020
Weather permitting, the intersection at Jan Davis Drive at BAE/Raytheon will begin functioning as a signalized intersection on Tuesday, May 19 at approximately 9 a.m.
Due to changes in the traffic operation of this intersection, motorists are advised to use caution, and obey all traffic control signs and signals at this location.
If further information is needed, please contact the Traffic Engineering Division at 256-427-6850.