1. Development
  2. Streets & Roadwork
  3. Roadwork Updates
  4. Road Alerts

Temporary Road Closure: All lanes of Memorial Parkway for blasting

Published on January 28, 2021

HUNTSVILLE, AL – Weather permitting, a construction crew will conduct blasting operations at noon Friday, Jan. 29, at the intersection of Oak Dairy Lane and U.S. 231 (Memorial Parkway). The purpose of the blast is to clear rock for underground utilities for a residential development.

Northbound and southbound lanes of the Parkway will be shut down for about 15 minutes to accommodate the blasting. Northbound lanes will be closed at Green Cove Road. Southbound lanes will be closed near the 12400 block of the Parkway near Freedom Powersports.

Law enforcement will be conducting traffic control during the 15-minute shutdown. Drivers are asked to use caution.

For questions, contact the City of Huntsville Engineering Division at 256-427-5300.

For more details on roadwork projects and alerts, visit HuntsvilleAL.gov/RoadworkUpdates.

HSV Connect

Report a problem or submit a service request using Huntsville Connect

Get Started