New Signal Installation at Rock Cut Road and U.S. Highway 72 East
Published on December 31, 2018
Weather Permitting, the intersection at Rock Cut Road and U.S. Highway 72 East will begin functioning as a signalized intersection on Friday, January 4, 2019, at approximately 9 a.m.
Due to changes in the traffic operation of this intersection, motorists are advised to use caution, and obey all traffic control signs and signals at this location.
If further information is needed, please contact the Traffic Engineering Division at 256-427-6850.