Council Member John Meredith

John Meredith

Council Member , District 5

Huntsville City Council Member John Meredith is the son of civil rights icon James H. Meredith, the first African American to enroll and graduate from the previously segregated University of Mississippi.

John’s first career was as a laboratory technologist. While managing a hospital-based clinical lab in Kansas, John participated in a Washington fly-in as a member of the clinical lab manager’s association to lobby against a bill that would eventually have a profound negative impact on the delivery of services to patients. He found the process fascinating and, after securing a master’s degree a year later, rededicated his professional efforts to government.

Full Bio >

 

Recent Posts

New safety improvements target speeding and pedestrian awareness along Bailey Cove Road

November 5, 2026 Click to view New safety improvements target speeding and pedestrian awareness along Bailey Cove Road

Drivers traveling along Bailey Cove Road will notice new safety measures designed to increase awareness, encourage compliance with school zone speed limits and better protect pedestrians, particularly students traveling to and from school. The City has completed several improvements along the corridor near Mountain Gap Elementary and Middle schools, bringing together efforts from the City’s Traffic Engineering Division, Huntsville Police Department (HPD) and District 3 City Council Member Jennie Robinson. Among the [more]

Read More

City of Huntsville sets zoning for 2 large acreages

October 22, 2026 Click to view City of Huntsville sets zoning for 2 large acreages

The City of Huntsville finalized zoning changes for two large acreages in east and west Huntsville. The City Council approved the zoning of 536.68 acres in east Huntsville to Residence 1 and Residence 2 Districts. Known as Cleary Farm, private developers are planning to build single-family homes on the land west of U.S. 72 and north and south of Little Cove Road. Much of the land will also be preserved in [more]

Read More

Don’t let fallen leaves create neighborhood hazards and headaches

October 15, 2026 Click to view Don’t let fallen leaves create neighborhood hazards and headaches

While the season for mowing lawns is almost over, the season for attending to falling leaves is just beginning. Despite the beauty they provide as the summer temperatures finally cool, they can be a hazard if not collected. Flooding, street damage and safety hazards When leaves pile up along the curb or slip into storm drains, they can block vital drainage pathways. During heavy rain, water has nowhere to go, backing up [more]

Read More

City of Huntsville moves forward with design contracts on Limestone County roads

October 8, 2026 Click to view City of Huntsville moves forward with design contracts on Limestone County roads

The City of Huntsville approved two engineering design contracts for road improvements in Huntsville-annexed Limestone County. The City approved a design contract with SAIN Associates for the Greenbrier Parkway interchange at Interstate 565 for northbound access improvements that will include upgrades at Greenbrier Parkway and Greenbrier Road about a half-mile north of the interchange. The contract, to be completed by April 2028, will include a traffic corridor analysis, field surveys and new [more]

Read More

City Council certifies results of municipal election District 3 runoff

September 29, 2026 Click to view City Council certifies results of municipal election District 3 runoff

The City Council canvassed the results of the municipal election District 3 runoff during a special session. Incumbent Jennie Robinson was certified the winner with 3,776 votes (52.36%). Liliana Peinder had 3,436 votes (47.64%). Voter turnout in the runoff was 19.89%. District 2 Council Member David Little and District 4 Council Member Bill Kling were certified as winners on Sept. 1 All officials elected during the 2026 municipal election will be sworn into office on [more]

Read More

Additional Information

Contact

  • Phone:

    256-427-5011

  • Address:

    City Council Office

    Huntsville City Hall

    6th Floor

    305 Fountain Circle

    Huntsville, AL 35801

  • Email:

    John.Meredith@HuntsvilleAL.gov

    John Meredith

    Council Member, District 5

  • Hours:

    By Appointment

  • Request A Meeting

District 5 Calendar

There are no scheduled events in this category at this time. Check back later for updates.